Always in Search for a Better Way to Build — Part Two

Part two of our series on continuous improvement in ICF construction — looking at how alignment, pour sequencing, and crew communication affect the finished wall.
Myth-busting Basements with ICFs

Basements and below-grade construction with ICF carry a set of persistent misconceptions — about moisture, about cost, and about what the concrete wall system actually provides.