The Penna Residence project captures the ICF construction sequence in detail: Fox Blocks forms stacked course by course, then interior shoring in place before the structural concrete pour. These photographs represent the build discipline required to achieve a plumb and true ICF wall system at residential scale.
Interior shoring supports the wall assembly and keeps the formwork stable during the pour — a phase where the Forming Solutions alignment rental system provides additional control. The photographs show the organized progression from form stacking through pour preparation.
As one of the early archive projects, the Penna Residence establishes the standard of care that Forming Solutions and Penna Construction have applied across all subsequent work.