At the Belk Residence, ICF blocks were stacked with reinforcing steel placed in the cavity and scaffolding set around the walls.
Window bucks were installed in the braced Fox Blocks walls before concrete, locking in openings at their final size and position.
Penna Construction managed the ICF installation, with Forming Solutions supplying product and technical support.