The Ambrose project combined ICF walls with an Insuldeck foam deck system for an integrated concrete structure.
Wall courses were stacked while the Insuldeck panels were staged on site, ready for installation once the walls reached floor height.
Forming Solutions supplied the wall and deck products and technical guidance for the project.